Project SOA/API/webMethods Expert for the EIP Initiative (Worldwide & English speaking project)
Key responsibilities
• Study on the need and solution for a Application Integration layer in the Public Clouds
• Lead Architect in the definition of the PaaS EIP based on webMethods 10.1
• Adaptation of the architecture on a private IaaS
• Definition of an architecture for EIP PaaS based on OpenShift & a Home Made forge
• Technical consultancy and development on the Continuous Delivery work stream (Solution Architecture, Product Management
• Improvement of technologies and principles of the delivery pipelines
• Definition of testing strategies
Technologies Software AG webMethods 9.7/10.1 (incl: CentraSite, Mediator, Command Central, API Gateway…), REST/JSON, CrossVista TEAM Server, SonarQube, Jenkins, SVN, SoapUI, Agile/Scrum, Docker, Kubernetes, Openshift
Project SOA/webMethods Expert for the EIP Initiative (Worldwide & English speaking project)
Key responsibilities & achievements
• Lead Architect & Solution Architect for a HA architecture with inter-site HA requirements : EIP Elevated SLA
• Lead of Continuous Integration workstream (Product Owner/Scrum Master)
• Definition of high & low level requirements
• Definition of default build cycles, releases practices and workflow
• High & low level design (PoC…)
• Vendor Relationship
• Team & Technical leading
• Definition and deployment of a “close to reality” laboratory environment (WM8 & WM9)
• Initiator of performance testing practices
• Level 3 Support
Project Scoping & planning of the new Axa integration platform (Worldwide & English speaking project)
Key responsibilities & achievements
• Scoping of Axa Integration Framework
• High and low level designing of the high availability platforms
• Strong participation to the business model and portfolio of the centre of excellence (business as usual, service offers & RACI)
• Consultancy & expertise on many aspects :
• Vendor relationship
• SDLC
• Framework lifecycle
• Operations
• Security
Project Scoping of a migration from webMethods 6.1.5 to 8.2.2
Key responsibilities & achievements
• Analysis of existing integration processes and implementation practices
• Impact analysis
• Scoping of the migration plan and how-tos
• Writing of the new best practices and migration procedures
• Training (overview) of developers and operating teams
Project Implementation of a full SOA architecture as part of the IS global transformation project
Key responsibilities & achievements
• Producing material to convince and reassure stakeholders
• High and low level designing of the high availability platforms
• QA strategy of platforms and framework component
• Lead of the consultant’s team (4 people)
• Consultancy &expertise on many aspects:
• SDLC
• Operations
• Security
Project European implementation of a PaaS offer based on Oracle Fusion Middleware
Key responsibilities & achievements
• Help defining what the final offer should be both on cloud and SOA aspects
• Producing material to convince and reassure stakeholders
• Scoping and designing the prototype
Project High Availability for Real Time Producer Interface
Key responsibilities & achievements • Technical and software architecture of the EAI/ESB HA main site & backup site
• High and low level design and configuration of both site
• Impact analysis and workload study on the existing platform migration
• Help change management with partner IS
Project TPM & engineering for the EAI of the Energy Management IS
Key responsibilities & achievements • Quote, Workload & Delivery Plan Management
• Lead of a relocated developers and operators team
• Management of infrastructure change
• Lead of the migration plans
• Lead of operating levels coordination
• Industrialization of back-office processes
• Incident & Problems management
Project Implementation of an EAI infrastructure “from scratch” and porting of two supply chain processes. (English speaking project).
Key responsibilities & achievements • Design and realization of the core integration framework (Monitoring, Transcoding, Error management...)
• Realization of the platforms and frameworks installation procedures
• Formation of operating teams to platforms and assets operations
• Formation of project teams to the implementation best practices and frameworks
Project Study and prototyping of an integration solution between an AtoS made monitoring solution and webMethods Optimize 6.5
Key responsibilities & achievements • Realization of a use case BPM process
• Study of functional capabilities cover between the two solutions
• Suggestion of multiple technical solution of integration
• Determination of the functional & technical requirements
• Realization of a prototype for commercial purposes
• Competency transfer to the team