o New sanctions lists and FML rules integration into Firco Continuity Filter engine
o Non regression tests
o Good guys setup and optimization
o Assisted compliance team with FircoContinuity decision software and new workflows
Projet: Alimentation d’un infocentre pour le reporting financier
Réalisation:
Encadrement d'une équipe de 5 personnes,
Recueil du besoin et demandes d’évolutions (nouveaux indicateurs),
Etudes des impacts et proposition de scénarii,
Chiffrage et planification,
Etudes de l’architecture technique cible,
Rédaction des rapports d’études,
Gestion du projet Datamart GPP et coordination des acteurs,
Planification des jalons et suivi des livrables,
Coordination MOE/MOA et des équipes de la DSI,
Suivi de la qualification et de la recette,
Participation à l’élaboration du plan de déploiement,
Reporting projet et participation aux comités : Coproj, Copil,
Animation des comités de pilotage et suivi des indicateurs de la TMA,
o Liaise with technical support at SWIFT for mandatory SAA/SAG/SNL upgrades and evaluate business impacts
o Installation and configuration of SAA/SAG in UAT environment, support for operations teams
o Wrote maintenance and NCB disaster management guides
o Implemented SCT SEPA messages filtering
o Installed and setup filtering Fircosoft software (Firco Continuity suite) into existing platform; merged and
segregated flows
o Configured MQ Series connections with new back-office systems
o Executed technical and non-regression test scenarios
Migration Project Manager
o Migrated SAA 6 to SAA 7 into new UAT servers in Edinburgh (high-availability cluster under VCS control)
o Merged of two SAA 6 into one single SAA 7 ; designed new routing rules, interfaces and users/profiles
o Wrote installation documentation to hand over to technical operations teams in London and Edinburgh
o Updated guides for 3rd parties (AML, maintenance teams) and workflows
Business Analyst SWIFT Portfolio – Technology Services
o Separation from ABN Amro activities, liaised among stakeholders in order to understand the structure, policies
and operations at RBS
o Merged local branches Luxemburg and Switzerland messages from SAA 6 hubs to HQ RBS Amsterdam
o Brought new interfaces/connections and validated testing (LPM by Logica...)
o Managed SWIFTNet certificates within SWIFT PKI infrastructure
o Updated management procedures and hand over to offshore (India) maintenance teams
o On-site SWIFT technical and business consultancy for several customers onto different architectures
o Assisted new customers to setup entire new connection to SWIFT
o Helped customers to write internal processes guides
o Wrote operational audits on demand and provided technical support
Business Analyst for Banks and Corporates
o Participated in main projects involving SWIFT (migration from ETEBAC to FileAct, Ma-CUG subscription, Target2
subscription, etc.)
o Assisted customers to join Euroclear Single Platform CCI system through SWIFT
Step2, EURO1 and Target2)
o Responsible for the Cristal version used by clearing house EBA for EURO1 system
o Wrote technical specifications for EURO1 End-of-Day settlement module been integrated into the core version of
Cristal software and minimize impact changes
o Developed the EURO1 End-of-Day settlement module
o Participated to EBA testing on-site with operations team
o Installed and setup SAA/SNL on UNIX AIX HACMP cluster environments
o Managed migration project, met mandatory SWIFT delivery deadlines
o Supported EURO1 End-of-Day Settlement process by dealing with EBA operations team