Industry Discrete Manufacturing
Project Description SAP SCM-EWM 9.4 – Manufacturing Integration and Outbound (Design, implementation and Support)
Role Solution Consultant for Staging Process and Goods Receipt Production
Responsibilities/Deliverables
• Scope of Solutions: Focus Area Phase 1 – Lead consultant manufacturing integration with goods receipt of finished products and component staging.
• Hypercare support/ process-improvement: hands-on intensive go-live support on shopfloor during 3 months period with shiftwork (morning – afternoon – night) in eWM.
• Component Staging, Goods Issue and Component Return processes.
• Finished Goods reception from Production.
• Focus Area Phase 2 - Lead consultant outbound process finished products
• Process Oriented Set-up with Pick/Pack/Stage/Load
• Customer-specific label design and label printing set-up.
Industry Volume/Discount Retail
Project Description SAP SCM-EWM 9.4 – Outbound (Design and implementation)
Role Solution Consultant for Outbound Processes
Responsibilities/Deliverables
• Scope of Solutions: Focus Area Phase 1 – Wave Management and Order Pick Planning with Pick-to-Voice. Yard Management with dock-door planning.
• Single Store picking with pick-box optimisation .
• Multiple Store picking with pick-box optimisation
Industry Pharmaceutical industry
Project Description SAP SCM-EWM 9.2 – Manufacturing Integration (Design)
Role Solution Consultant for Staging Process and Goods Receipt Production
Responsibilities/Deliverables
• Scope of Solutions: Focus Area Phase 1 – Lead consultant for Conceptual Design Manufacturing Integration and Quality Mgmt Integration, incl. Issue Resolution.
• Component Staging, Goods Issue and Component Return processes.
• Finished Goods reception from Production with integration MES.
• Integration EWM/QIE with ECC/QM.
Industry Pharmaceutical industry:
Project Description SAP SCM-EWM 7.1 – European Distribution Centre in La Louvière (Design and Implementation)
SAP SCM-EWM 9.1 – Distribution Centre in Beerse (Design and Implementation)
Role Solution Consultant for Inbound and Internal Processes, QIE
Solution Consultant for Outbound Process and Serialization
Responsibilities/Deliverables
• Scope of Solutions: Focus Area Phase 1 – Lead consultant for implementation Inbound Processes: Conceptual Design, Implementation and Customizing, Training and Support Go Live.
• Purchase Order and ASN-flows with Quality Inspection (QIE/QM) integration in ERP2.
• Inbound Workcentre Integration.
• Customer Return-flows with EWM-Inspection.
• Integration Warehouse Control System.
• Focus Area Phase 2 – Lead consultant for implementation Internal Processes: Conceptual Design, Implementation and Customizing, Training and Support Go Live.
• Replenishment-flows: Order Related and Planned Replenishment from High Bay Area towards automated Miniload.
• Pallet-Split flows with integration PTM (Pick-to-Man) Workcentre-environment.
• Integration Warehouse Control System and Conveyer Transport.
• Repacking flows
• Focus Area Phase 3 – Lead consultant for implementation Outbound Process: Conceptual Design, Implementation and Customizing, Training and Support Go Live.
• SO and STO-flows with Serial Number Mgmt integration.
• Pick, Pack and Consolidation process.
• Integration Warehouse Control System.
• Focus Area Phase 4 – Lead consultant for integration of SAP EWM 9.1 and legacy ERP system: Conceptual Design, Implementation and Customizing, Training and Support Go Live.
• Interface: Architectural Solution Analysis.
• Testing and Issue resolution.
Industry Food industry: Bakery, Patisserie (Finished Products)
Project Description SAP ECC 6.0 – Global Template (Blueprint and Realization)
Role Solution Consultant for Recipe Management and Global Label Mgmt
Responsibilities/Deliverables
• Scope of Solutions: Focus Area – Lead consultant for implementation Recipe Mgmt: Conceptual Design, Implementation, Training, and Support Go Live.
• Focus Area – Conceptual Redesign for Global Label Solution at HQ and subsidiaries.
Industry Chemical - PVC Profile Business: Extrusion and Logistics
Project Description SAP R/3 4.6 – Project Start through Phase 1 and Phase 2
Role Solution Consultant for Logistics Execution
Responsibilities/Deliverables
• Scope of Solutions:
• Focus Area 1- Warehouse Mgmt, inclusive Handling Unit Mgmt and RF and Extensive Distribution Activities to Branches (depots) all over UK.
• Focus Area 2 - Variant Configuration: Configuration of packs and kits for building components in sales activities.
• Project prep work performed
• Blueprint work
• Configuration responsibilities
• Testing responsibilities
• Training responsibilities
• Post go-live support
Industry Waste Transportation, Storage, Manipulation and Treatment
Project Description SAP R/3 4.6– Project Start through Phase 1 and Phase 2
Role Solution Consultant for Logistics Execution
Responsibilities/Deliverables
• Scope of Solutions: Focus Area 1 - Logistic execution: Warehouse Mgmt, inclusive Handling Unit Mgmt for an intermediate Storage Depot
• Focus Area 2: Material Management (Waste Treatment) as part of the Integration with EH&S: storage of dangerous goods.
• Project prep work performed
• Blueprint work
• Configuration responsibilities
• Testing responsibilities
• Training responsibilities
• Post go-live support
Industry Consumer Products industry: High-Tech
Project Description SAP ECC 6.0 – Global Template (Blueprint and Realization)
Role Solution Consultant for Variant Configuration and Manufacturing
Responsibilities/Deliverables
• Scope of Solutions: Focus Area – Design Business processes for Make-to-Order and Assemble-to-Order Sales Order and Manufacturing Processes. The design is represented via business flow charts (Scoping operational processes), Functional Specifications (System behavior) and Prototypes.
• Product Range: Configurable laptops
Industry Chemical – Production and distribution herbicides
Project Description SAP ECC 6.0– Project Start Phase 1
Role Solution Consultant for eWM
Responsibilities/Deliverables
• Scope of Solutions: Focus Area 1 – Analyse existing warehouse and distributions requirements and map with WM and eWM functionalities.
• Focus Area 2 – Write out Solution proposal and roadmap for Extended Warehouse Management.
• Product Range: Herbicides.
• Project prep work
• Blueprint work: Creation and demonstration of prototype in Extended Warehouse Management.
• Configuration responsibilities.
Industry Pharmaceutical Industry
Project Description SAP R/3 4.6 – Project Pick-to-light for dynamic Warehousing.
Role Solution Consultant for Warehouse Management
Responsibilities/Deliverables
• Scope of Solutions: Focus Area 1 - Logistic execution: Warehouse Mgmt in combination with a Pick-to-light system.
• Focus Area 2 - Interface description and implementation with Knapp (software provider for pick-to-light). Focus: IDOCS for Transfer Orders.
• User Exit description for combining Transfer Orders.
• Configuration responsibilities
• Testing responsibilities
• Training responsibilities
• Post go-live support