– Work in the Basis Team. AIX 6.0, ECC6, SCM , Hana, Solution Manager 7.2
Project Architecture Solution Design
- Solution Manager 7.10 set-up
- Manage Transport with Quality Gate Management
- Customer 2nd and 3td level support.
- Performance Issue Solving on ECC, , Portal, Hana.
- Roles And Authorisation set-up
- Firefighter set-up
- Jobs set-up with Dollar Universe with the team.
Work in the Basis Team. AIX 6.0, ECC6, SCM , Hana, Solution Manager 7.2
- Upgrade SCM 7.0 SP5 DB2 to SCM 7.14 SP5 Hana
- Project Architecture Solution Design
- Solution Manager 7.20 set-up
- Upgrade ECC6 Ehp6 to ECC6 EhP8
- Kernel 7.49 upgrade
- Manage Transport with Rev-Track
- Customer 2nd and 3td level support.
- Performance Issue Solving on ECC, , Portal, Hana.
- SAP Cloud application Support.
- Roles And Authorisation
Work in the integration Team. AIX 6.0,
- Upgrade from version 4.7 Enterprise to version ECC6 EHP5.
- Project Architectur Solution Design
- Solution Manager 7.10 set-up
- Upgrade ECC6 Ehp6 to ECC6 EhP7
- Kernel 7.40 upgrade
- Java 7.4 installation
- Manage Transport with CHARM
- Customer 2nd and 3td level support.
- Performance Issue Solving on ECC, , Portal, Oracle, Oracle, Sql Server.
- PO Project Support.
work on several customer using Oracle, DB2, SQLServer and also deferent OS Windows server, Linux se. SAP Netweaver 7.40.
- Upgrade from version 4.7 Enterprise to version ECC6 EHP5.
- SAP ECC6 instance installation
- Solution Manager Upgrade from 7.0 to Solution Manager 7.10.
- P.O. Production Support.
- P.O. incident Solving.
- Solution Manager 7.10 set-up
- Instance Java split
- Upgrade ECC6 Ehp5 to ECC6 EhP7
- Split Java instance.
- Kernel 7.40 upgrade
- Java 7.4 installation
- Manage Transport with CHARM
- Customer 2nd and 3td level support.
- Performance Issue Solving on ECC, BW, Portal, DB2, Oracle, Sql Server.
- Oracle Upgrade from Oracle 10.2.0.5 to Oracle 11.2.0.4.
Upgrade from version 4.7 Enterprise to version ECC6 EHP5.
- SAP ECC6 instance installation
- Upgrade Project Support
- Analyse et résolution de de problème de ECC6, BW 7.xx., CRM.
- ECC6, CRM, BW, BO : authorization set-up and maintenance.
- PI 7.10 et CRM 7.0 installation and project support
- SSO architecture and Set-up.
- Solution Manager Set-up.
- Oracle, ECC, BW, CRM, Solution Manage, PI Upgrqde
- BW Netweaver 7.30 Administration and Set-up
- BPC upgrade from 7.9 SP5 to BPC 10
- ECC, BW, CRM : System Copy
ECC6 Enhancement Package 6 installation.
Writing Architecture Dossier.
- Choice of solution
- Drafting of documents of decision
- Set up test plans
Solution Manager Installation and Customizing
- Charm Set-up: Workshops Organization and Customizing.
Complex system landscape composed of 3 project lines and 1 production line.
- In charge of the Basis team composed of 6 consultants
- Manage steering committee
- Manage operational committee
- Relationship with project team.
- Solution Manager Installation
- landscape set-up
- Solution Manager- CHARM set-up
- Audit of performance
- SAP ECC6 production and development Optimization
- SRM 7.0
- ( Abap et Java) Installation
- Administration SRM 7 ( Abap et Java).
- Manage background Jobs with $U
- SRM 7.0 : Architecture set-up
- Team management
- Pi set-up, customizing, System Copy
- Enterprise Portal 7.0 Installation and Set-Up
- Adobe print Form set-up
- Solution Manager setup
- Landscape Architecture defined
- Transport Management Architecture
- Performance optimization