CV/Mission REACTOR freelance

Je dépose une mission gratuitement
Je dépose mon CV
Vous êtes freelance ?
Sécurisez votre activité grâce au portage salarial !

Exemple d'expériences de Haroun,
freelance REACTOR habitant les Hauts-de-Seine (92)

  • Managing consultant, Project Planning Manager

    FIVES Nuclear
    Jan 2015 - Jan 2016

    Construction of latest generation reactor EPR 1650 MWe pressurized water reactor PWR . Scope of piping s and equipments in nuclear zone. Customer AREVA/EDF

    Responsible of project planning. Scope of works prefabrication, installation, testing of piping system. including quality documentation of 6 000 isometrics, 18 km of pipes, 5 200 equipments, 3 400 supports ;
    New Project baseline schedule and mobilization plan. Planning level IV around 80 000 tasks ;
    Develop project progress system, Risk Analysis Delay system;
    Realization of planning procedures & Monthly project report;
    Responsible of planning team Schedulers . Primavera training,

  • Managing consultant, Project Planning Manager

    TRACTEBEL Engineering ENGIE Nuclear - Paris IDF
    Jan 2014 - Jan 2015

    CIGEO Storage of radioactive waste in deep geological formations. The Storage Center is basic nuclear installation consisting of an underground facility 275 km of underground gallery, technical area, and surface installations. Customer ANDRA French National Radioactive waste management Agency
    Web Link http //********-cigeo-principe-de-stockage-des-dechets-de-moyenne-activite-a-vie-longue_tech

    Responsible for project planning team Schedulers ;
    Responsible for interface with the client scope of design & construction schedule ;
    Realization of Design Planning ; master plan & detailed schedule loaded with man-hours ;
    KPI Physical Progress curves, Resources Bart-Chart, Critical path and activities, ... ;
    Realization of monthly progress report;
    Realization of Planning Execution Plans and Planning Procedure;
    Realization of detailed schedule of construction including digging, civil works, mechanical & electrical equipments, pre-commissioning. Schedule loaded with global man-hours & materials resources; analysis of materials and labor flows.
    Participation to establish the Project Risk Analysis.

  • Managing consultant, Planner

    AREVA Nuclear Lyon France
    Jan 2013 - Jan 2013

    Installation and operational maintenance. EPC Export Project - Maintenance Outage Amelioration and revamping of nuclear installation.

    Drawing up of BID & Project Schedule. Definition of scopes of work for all stakeholders. Construction of Project Baseline Schedule with Labor s roles.
    Achievement methodology of WBS with workload needs. Implementation of Key Project Indicators.
    Creation of training manual - Primavera P6 user Resource Allocation, Earned Value Management, Reporting and Risk Analysis planning.
    Realization Notes of Planning by project and Training to the Personnel & Project Managers. Training to create, implement & maintain the schedule.

  • Project Control Manager /

    JESA - JACOBS Engineering US and OCP Marocco, Infrastructure / Mining & MetalsCasablanca Morocco
    Jan 2010 - Jan 2012

    Construction of two plants Di Ammonium Phosphate. Construction of the first two phosphate processing plants that are part of a major investment program of OCP to increase production capacity. Project actual cost at $ 400 million, 5,2M Man-hours. Construction Management project.

    Responsible for EPCM project control team Project controls team 2 schedulers, 1 cost engineer, 2 quantity surveyors, 1 analyst ; Piloting of a contracting party.
    Detailed reporting on the physical progress of the project and budget with the Construction Manager and Client. Development of a convergence flat for reporting project milestones with the Top Management ;
    Participation in meetings of feedback on outsourcing contracts Type of contract sum and / or slip-refundable . Participation in the negotiation meetings with subcontractors on aspects of project control cost and time ;
    Presentation of data on the situation and budgetary calendar, critical points in all project meetings with client Monthly Review, Task Force ;

    Developing an overall planning level 3, calendar with its objectives. Construction and animation of interactive sessions planning 3000 tasks ;
    In collaboration with the general contractor, development and validation of formats required for all daily, weekly and monthly required;
    Participation in the development of the implementation plan for the construction phase - Annexes project control;
    Implementation of procedures for project management planning guide - rules detailed project planning
    Validation procedures declined by the general contractor;
    Analysis and validation of reference detailed planning of the construction phase Planning Level 4 - about 18 000 jobs over 18 months . Resource validation construction equipment and personnel engaged on the Project Plan initial charge ;
    Weekly monitoring of planning and coordination with engineering Detailed studies conducted in Mumbai India, Procurement and performed in Greenville USA Casablanca Morocco . Scope of Study phases and Purchasing Civil Engineering and steel structures, mechanical equipment drying unit with chimney, filtration unit, granulators, conveyors, electric motors, fuel tanks and acid ... electrical equipment transformers, cables, ... and instrumentation. Piping of all types and sizes;

    Monitoring weekly planning phase of construction on all disciplines Civil, Structural, Mechanical and Electrical Equipment, Piping and Instrumentation ;

    Project Risk analysis and cost schedule, followed by critical paths, tracking critical tasks, productivity and performance;
    Implementation, monitoring and validation periodic reports, indicators S-Curves of the project trends / forecasts and fiscal calendar time and costs . Resources mobilized manpower and equipment.
    Validation of tenders for the selection of subcontractors costs, delays and contract annexes for the control part of the project ;
    Monitoring and validation billing subcontractors with reference to contracts correction of 8 on average bills . Endorsements contracts project management and equipment suppliers;
    Creation of database for the compilation of dossiers Claims.

  • Managing consultant, Lead Planner

    DEGREMONT ENGIE Environment/ Paris IDF
    Jan 2010 - Jan 2010

    Assistance Design and Construction of two water treatment plants. Offshore project Qatar & Sri Lanka . Engineering & installation phase Design, Procurement, Construction, Equipments Erection and Commissioning .

    Creation of the project structure WBS & detailed schedule. Set up & update of the schedule and budgetary table.
    Coordination of project budget for all engineering services. Cash flow of the budgetary headings Follow up of consumed and estimated resources, program and budget forecasting ;
    Cause Analysis of the delays in the schedule and variations in the budget;
    Realization of KPI S-curves, the tables of analysis of the delays, critical paths and workloads periodical progress reports.

  • Managing consultant, Planner

    SUBSEA 7, Oil&Gas/ Paris IDF
    Jan 2008 - Jan 2008

    PAZFLOR offshore Project in Angola for TOTAL in a consortium with TECHNIP & SUBSEA7. Installation of 81 km of subsea flow lines, umbilical and structure. Engineering, Procurement, Fabrication & Shipment of the Equipment. Customer TOTAL
    Web Link http //********-de-total-de-la-decouverte-du-champ-de-petrole-a-son-exploitation_tech

    Organize workshops to determine the Work Breakdown Structure of the project and the responsibility of the work packages.
    Elaboration of the Master Planning and convergence plan including the interface between the JV schedule, supplier schedule, Intermediate milestones and final target .
    Create a baseline schedule in accordance with the convergence plan Interactive Session Planning . Using Primavera P3. Inspect and review of engineering master list and integration all issues expected.
    The establishment of consolidation statements with the provisional contractual duration

  • Managing consultant, Lead Planning /

    AREVA Nuclear/ Cadarache France
    Jan 2007 - Jan 2008

    Project ATUE. Decommissioning two nuclear plants Site of Center of atomic energy, CEA with a target to have the nuclear approval of downgrading the buildings. EPCM contract. Customer CEA

    Presentation of data on the situation, critical points in the monthly project meetings with client Monthly Review, Task Force ;

    Prepare and follow the detailed schedule of the decommissioning and treatments of nuclear plant Including the interface and the constraint between the contractors .
    Set up of the project structure WBS and detailed schedule Interface between the phases of dismantling materials, dismantling equipment, cleansing/destruction of the building and control level of radioactivity.
    Consolidate into the schedule the constraints of nuclear safety, the planning of conditioning and transport of ...

  • Project performance /ATMEA JV AREVA & MITSUBISHI Nuclear/ Paris IDF
    aujourd'hui

    Develop the advanced generation reactor ATMEA1 1100 MWe pressurized water reactor PWR .
    800 000 hours of Design activities for obtaining of the European and American nuclear certification. EPCM contract.
    Web Link https //******** v qQb817YVwkA

    Creation a convergence plan & new baseline schedule including 3500 engineering deliverables Organisation of Interactive Planning Session .
    Mutualisation of the AREVA & MHI Contractor s schedule and updating of the global schedule. Following up the progress of engineering issues. Using Primavera P6.
    Establishment of Project control reports. Implemented the tools to measure the performance. Project progress, cash flow, schedule performance analysis

Voir le profil complet de ce freelance

Expertises comparables à REACTOR potentiellement demandées

CV REACTOR, Missions REACTOR

Les derniers freelances REACTOR

CV Développeur web JAVA
Walid

Développeur web JAVA

  • HENNEZIS
JAVA Angular Spring Boot SPRING BATCH SPRING WEBFLUX
Disponible
CV Développeur web PHP
Joseph

Développeur web PHP

  • SAINT-IGNY-DE-ROCHE
HTML5 CSS PHP WORDPRESS JAVASCRIPT RESPONSIVE DESIGN MYSQL Adobe Creative Cloud Angular REACTOR
Disponible
CV Ingénieur de développement JAVA
Aymen

Ingénieur de développement JAVA

  • ROUBAIX
SCRUM JAVA SQL J2EE Spring Boot Cloud AWS ORACLE Kubernetes
Bientôt disponible
CV Développeur Backend Java Kotlin
Mickael

Développeur Backend Java Kotlin

  • CAEN
JAVA Kotlin Spring Boot SPRING WEBFLUX Kafka DOCKER Microservices ELASTICSEARCH
CV Spécialiste en simulation numérique – Automatisation des process
Youssef

Spécialiste en simulation numérique – Automatisation des process

  • ATHIS-MONS
ANSYS
Disponible
CV Data Scientist
Kevin

Data Scientist

  • PARIS
Data science PYTHON Mécanique PYSPARK Microsoft Power BI SQL Cloud AWS Google Cloud Platform
CV Ingénieur de développement FullStack JAVA/ Angular / Kubernetes
Kevin

Ingénieur de développement FullStack JAVA/ Angular / Kubernetes

  • LE PLESSIS-TRÉVISE
JAVA Angular Kubernetes HTML CSS REDHAT OPENSHIFT Kafka
CV Développeur JAVA
Cheickh Ahmed Tidjane

Développeur JAVA

  • VAL-DE-REUIL
J2EE JAVA ORACLE SQL
CV Développeur JAVA/Angular
Noureddine

Développeur JAVA/Angular

  • VILLEURBANNE
JAVA Spring Boot Microservices API RESTful JAVASCRIPT Angular DEVOPS SQL Vue.js
CV Développeur Fullstack
Cengiz

Développeur Fullstack

  • BONS-EN-CHABLAIS
PHP JAVASCRIPT PYTHON PHP LARAVEL SYMFONY CSS HTML REACTOR JQUERY GIT
Je trouve mon freelance REACTOR

Les nouvelles missions REACTOR

Développeur backend mobile IOS/Android

JAVA API RESTful IOS ANDROID
ASAP
59 - Lille
12 mois
Voir la mission

Développeur Mobile IOS/ANDROID

ANDROID Kotlin API RESTful iOS Spring Boot
ASAP
59 - Lille
5 mois
Voir la mission
Je trouve ma mission REACTOR